Installation of a managed stormwater system in association with a commercial project.
Required Forms & Documents
- Application Stormwater Permit Application Package (1 original signed)
Fees
- Line & Grade: Varies (see application package)
Review Disciplines
- Intake/Sufficiency: An "at the counter" intake/sufficiency review of the application & its required documents to verify completeness for acceptance and payment of initial fees.
- Permit Issuance: At this point, work may commence. The applicant will receive an approved copy of the permit package and a Permit-Inspections Job Card to be posted at the site printed with a list of the required inspections needed to complete the permit.
Typical Inspections/Certifications/As Builts
- Inspections for this permit depend on the scope of the permit.
Note: Fee payments by check should be made payable to either "CCBCC" or Charlotte County Board of County Commissioners. Payments are also accepted by Mastercard or Visa credit or debit cards.