Posted Date: 9/14/2022
Effective Date: 9/13/2022
The fill cell (203) inspection will no longer be a required on most permits. This scope of work is inspected at the same time as the bond beam (212) inspection. The requirement of a fill cell inspection will only be added at the discretion of the plan examiner.
For any questions feel free to contact Jack McStravic at 941.743.1249 or Jack.Mcstravic@CharlotteCountyFL.gov.