Text Size:
Standard Drawing Details
 
​Charlotte County Utilities has outlined its “Standard Drawing Details.” These standards and drawings are required for all plans. The Autodesk DWF format requires the current version of Autodesk DWF viewer to view and print. You can download the Autodesk DWF viewer by clicking the link in the Related Links section to the right.
 
Standard Drawing Detail​​s 2011​​DWF FilesPDF Files​
​Section 1: General Notes

​Section 2: General Details
​Section 3: Gravity Sewer
​Section 4: Lift Stations
​Section 5: Low Pressure Sewer
​Section 6: Potable Water
​Section 7: Reclaimed Water
​All Files from Sections Above
 
​​​​​​​​​
Splash Category
Please pick a category for the splash banners for this page.
Accordion Menu
Source Type:
URL
Source URL:
/dept/utilities
Section to Open Index:
4
Please pick a source for the accordion menu on this page:
{MAIN}:use the same menu as the public site home page.
{Local Site}: use a list from the local site.
{URL}: use a list from the URL specified in the URL textbox.
Twitter URL
 
Your Twitter URL (optional)
YouTube URL
 
Your YouTube URL (optional)
Image Gallery Category
 
Category in the image gallery to filter images for.
Image Gallery Direction
 
Flow gallery horizontally or vertically on the page.
Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing.