Bayshore Live Oak Park - West Fishing Pier
Last Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Bayshore Live Oak Park Seawall ReplacementLast Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Cedar Point Pier ReplacementCharlotte Harbor Event Center Seawall Replacement
Last Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Charlotte Harbor Event Center Seawall ReplacementDarst Park Shoreline and Boarding Pier Repairs
Last Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Planning and Project Approval
Darst Park Shoreline and Boarding Pier RepairsLast Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.
South County Regional Park Improvements-Final Phase
Last Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Design Development
Riverside Boat Ramp Replacement
Last Updated: 02/12/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Last Updated: 02/11/2026 Category: Parks And Recreation Current Phase: Design Development
The Bayshore Grass Parking area was severely damaged by Hurricane Milton. A new assessment is required to confirm that the previous design will still meet current project needs. Submittals have been received, and an engineer of record has been confirmed. Contract negotiations are in progress, and once final designs are approved, the County will advertise the project for construction bids to begin reestablishing and hardening the parking area.