Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities RepairsLast Updated: 12/17/2024 Current Phase: Planning and Project Approval
The drainage study will consist of the collection of hydrologic and hydraulic data, an existing conditions stormwater model, and evaluation of conceptual improvements to the existing stormwater management system within the Burnt Store drainage area.Last Updated: 10/17/2024 Category: Drainage Current Phase: Planning and Project Approval
Remove vegetation from the bottom of the drainage ditch in order to enhance drainage.Cape Haze Wastewater Expansion
Last Updated: 09/10/2024 Category: Utilities Category: Utilities Current Phase: Complete
Ainger Creek Boat Ramp Replacement
Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.
Family Services Center - Phase 2
Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete
Design a new scalable fire station to replace the existing station.Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete
Design a new scalable fire station to replace the existing Fire Station 5. The new station will be located along Burnt Store Road.Burnt Store Road East-West Connector
Last Updated: 01/17/2024 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.SR 776 Wastewater Force Main Replacement
Last Updated: 12/15/2023 Category: Utilities Current Phase: Complete
This project will install a new 16-inch to 20-inch force main along State Road 776.