Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Projects

Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.

Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities Repairs
Burnt Store Drainage Study News Image

Burnt Store Drainage Study

Last Updated: 12/17/2024 Current Phase: Planning and Project Approval

The drainage study will consist of the collection of hydrologic and hydraulic data, an existing conditions stormwater model, and evaluation of conceptual improvements to the existing stormwater management system within the Burnt Store drainage area. 

Read More

DeSoto Ditch Flow Enhancement

DeSoto Ditch Flow Enhancement

Last Updated: 10/17/2024 Category: Drainage Current Phase: Planning and Project Approval

Remove vegetation from the bottom of the drainage ditch in order to enhance drainage.

Read More

Cape Haze Wastewater Expansion

Cape Haze Wastewater Expansion

Last Updated: 09/10/2024 Category: Utilities Category: Utilities Current Phase: Complete

Read More

Ainger Creek Boat Ramp Replacement News Image

Ainger Creek Boat Ramp Replacement

Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development

This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.

Read More

Family Services Center - Phase 2 News Image

Family Services Center - Phase 2 Sales Tax Project

Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout

Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services. 
 

Read More

Fire Station 2 News Image

Fire Station 2

Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete

Design a new scalable fire station to replace the existing station.

Read More

Fire Station 5 News Image

Fire Station 5

Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete

Design a new scalable fire station to replace the existing Fire Station 5. The new station will be located along Burnt Store Road. 

Read More

Burnt Store Road East-West Connector News Image

Burnt Store Road East-West Connector

Last Updated: 01/17/2024 Category: Roadway Current Phase: Planning and Project Approval

Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.

Read More

SR 776 Wastewater Force Main Replacement

SR 776 Wastewater Force Main Replacement

Last Updated: 12/15/2023 Category: Utilities Current Phase: Complete

This project will install a new 16-inch to 20-inch force main along State Road 776.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us