Project Status Updates

Pirate Harbor Maintenance Dredge - Exterior News Image

Pirate Harbor Maintenance Dredge - Exterior

Last Updated: 10/30/2025 Category: Coastal Current Phase: Design Development

Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system.  This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.

Read More

Rampart Boulevard Sidewalk Phase 2

Rampart Boulevard Sidewalk Phase 2 Sales Tax Project

Last Updated: 10/30/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

Rampart Boulevard Sidewalk Phase 2

Read More

South Gulf Cove Maintenance Dredge - Exterior

South Gulf Cove Maintenance Dredge - Exterior

Last Updated: 10/30/2025 Category: Coastal Current Phase: Planning and Project Approval

Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.

Read More

South Gulf Cove Parallel Locks Project News Image

South Gulf Cove Parallel Locks Project

Last Updated: 10/30/2025 Category: Coastal Current Phase: Planning and Project Approval

Engineering design project of the South Gulf Cove Parallel Lock.

Read More

Stump Pass Maintenance Dredge

Stump Pass Maintenance Dredge

Last Updated: 10/30/2025 Category: Coastal Current Phase: Complete

The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.

Read More

Sunshine Lake/Sunrise Waterway Monitoring Program

Sunshine Lake/Sunrise Waterway Monitoring Program

Last Updated: 10/30/2025 Category: Other Current Phase: Construction

This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway. 

Read More

Airport Road Sidewalk

Airport Road Sidewalk Sales Tax Project

Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval

Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 10/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Caring Way and Brinson Avenue Sidewalks

Caring Way and Brinson Avenue Sidewalks Sales Tax Project

Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development

Caring Way and Brinson Avenue Sidewalks

Read More