Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 10/30/2025 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
Rampart Boulevard Sidewalk Phase 2
Last Updated: 10/30/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk Phase 2South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 10/30/2025 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
South Gulf Cove Parallel Locks Project
Last Updated: 10/30/2025 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 10/30/2025 Category: Coastal Current Phase: Complete
The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.Sunshine Lake/Sunrise Waterway Monitoring Program
Last Updated: 10/30/2025 Category: Other Current Phase: Construction
This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway.Last Updated: 10/29/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP
Atwater Street Sidewalk Project
Last Updated: 10/29/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 10/29/2025 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue Sidewalks