Last Updated: 11/12/2025 Category: Parks And Recreation Category: County Facilities Current Phase: Planning and Project Approval
McGuire Park Phase II amenities will include additional picnic pavilions, extended parking area, architectural fencing and community center.
Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events.
Port Charlotte Beach Recreation Center
Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, three (3) bocce ball courts with shade canopies, two (2) pickleball courts with lights, one (1) tennis court with lights, and sanitary utility connection to the existing park restroom.Last Updated: 11/07/2025 Category: Parks And Recreation Current Phase: Construction
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Last Updated: 11/07/2025 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.
South County Regional Park Improvements-Final Phase
Last Updated: 11/07/2025 Category: Parks And Recreation Current Phase: Design Development
Ainger Creek Boat Ramp Replacement
Last Updated: 11/05/2025 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Last Updated: 10/27/2025 Category: Parks And Recreation Current Phase: Complete
Park master plan for Lake Betty Park
Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions and walking paths.








