Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

McGuire Park Phase II News Image

McGuire Park Phase II

Last Updated: 11/12/2025 Category: Parks And Recreation Category: County Facilities Current Phase: Planning and Project Approval

McGuire Park Phase II amenities will include additional picnic pavilions, extended parking area, architectural fencing and community center.

Read More

Port Charlotte Beach Pool News Image

Port Charlotte Beach Pool Sales Tax Project

Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events. 

Read More

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, three (3) bocce ball courts with shade canopies, two (2) pickleball courts with lights, one (1) tennis court with lights, and sanitary utility connection to the existing park restroom.

Read More

Bissett Park

Bissett Park

Last Updated: 11/07/2025 Category: Parks And Recreation Current Phase: Construction

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

Read More

Myakka Park News Image

Myakka Park

Last Updated: 11/07/2025 Category: Parks And Recreation Current Phase: Construction

Creation of a master plan through the park design process and phase 1 development.

Read More

South County Regional Park Improvements-Final Phase

South County Regional Park Improvements-Final Phase Sales Tax Project

Last Updated: 11/07/2025 Category: Parks And Recreation Current Phase: Design Development

Read More

Ainger Creek Boat Ramp Replacement News Image

Ainger Creek Boat Ramp Replacement

Last Updated: 11/05/2025 Category: Parks And Recreation Current Phase: Design Development

This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.

Read More

Lake Betty Park Phase 1

Lake Betty Park Phase 1

Last Updated: 10/27/2025 Category: Parks And Recreation Current Phase: Complete

Park master plan for Lake Betty Park

Phase 1 of the Master Plan includes a toddler playspace, ropes/ninja style athletic course, picnic pavilions and walking paths.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us