Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities RepairsNorth County Public Works Yard
Last Updated: 07/09/2025 Category: County Facilities Current Phase: Complete
A Public Works presence in North & Mid-County is critical for their operation. The old JB Yard on Kenilworth Blvd has been demoed for the new Charlotte Transit Facility. The County has purchased new property located at 18181 Sinatra Ave in Port Charlotte for the Public Works Yard.Last Updated: 07/09/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
The proposed pool will be 54% larger than the existing pool (140,000 vs. 65,000 gallons) and include lap lanes. The facility will have a check-in station, locker rooms, multiple restrooms, office space, a break room, storage areas, and restrooms for the pier.
Port Charlotte Beach Recreation Center
Last Updated: 07/09/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
Design and construct an approximate 20,000SF elevated recreation center within the Port Charlotte Beach Complex. The facility will provide a grand lobby, expansive porch area, two large event rooms, a conference room, a full catering kitchen, office space, and multiple restrooms.Riverside Boat Ramp Replacement
Last Updated: 07/09/2025 Category: Parks And Recreation Current Phase: Design Development
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 07/09/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Turnover and Closeout
Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .Last Updated: 07/08/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayWillmington Boulevard Sidewalk
Last Updated: 07/08/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard SidewalkBayshore Live Oak Park - West Fishing Pier
Last Updated: 07/07/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval
Total replacement of the western fishing pier at Bayshore Live Oak Park.Last Updated: 07/07/2025 Category: Parks And Recreation Current Phase: Construction
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.