Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Projects

Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.

Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities Repairs
North County Public Works Yard News Image

North County Public Works Yard

Last Updated: 07/09/2025 Category: County Facilities Current Phase: Complete

A Public Works presence in North & Mid-County is critical for their operation. The old JB Yard on Kenilworth Blvd has been demoed for the new Charlotte Transit Facility. The County has purchased new property located at 18181 Sinatra Ave in Port Charlotte for the Public Works Yard. 

Read More

Port Charlotte Beach Pool News Image

Port Charlotte Beach Pool Sales Tax Project

Last Updated: 07/09/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

The proposed pool will be 54% larger than the existing pool (140,000 vs. 65,000 gallons) and include lap lanes. The facility will have a check-in station, locker rooms, multiple restrooms, office space, a break room, storage areas, and restrooms for the pier. 

Read More

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 07/09/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development

Design and construct an approximate 20,000SF elevated recreation center within the Port Charlotte Beach Complex. The facility will provide a grand lobby, expansive porch area, two large event rooms, a conference room, a full catering kitchen, office space, and multiple restrooms. 

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 07/09/2025 Category: Parks And Recreation Current Phase: Design Development

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

Sheriff District 4 HQ, Training Facility and K9 Unit News Image

Sheriff District 4 HQ, Training Facility and K9 Unit Sales Tax Project

Last Updated: 07/09/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Turnover and Closeout

Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .

Read More

Gasparilla Pines Pathway

Gasparilla Pines Pathway

Last Updated: 07/08/2025 Category: Sidewalks Current Phase: Planning and Project Approval

Gasparilla Pines Boulevard Pathway

Read More

Willmington Boulevard Sidewalk

Willmington Boulevard Sidewalk

Last Updated: 07/08/2025 Category: Sidewalks Current Phase: Planning and Project Approval

Willmington Boulevard Sidewalk

Read More

Bayshore Live Oak Park - West Fishing Pier

Bayshore Live Oak Park - West Fishing Pier

Last Updated: 07/07/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval

Total replacement of the western fishing pier at Bayshore Live Oak Park.

Read More

Bissett Park

Bissett Park

Last Updated: 07/07/2025 Category: Parks And Recreation Current Phase: Construction

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us