Last Updated: 10/24/2025 Category: Parks And Recreation Current Phase: Complete
Sport Court Resurfacing at Bissett Park and William R. Gaines Jr. Veterans Memorial ParkWalking Path at Tippecanoe II Environmental Park
Last Updated: 10/24/2025 Category: Parks And Recreation Current Phase: Complete
Walking path at Tippecanoe II Environmental ParkRiverside Boat Ramp Replacement
Last Updated: 10/20/2025 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Placida West Boat Ramp Expansion
Last Updated: 08/28/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.





