Peachland Boulevard Sidewalk (HB41)

Project Description

Design and construct a 5' sidewalk on the north side of Peachland Boulevard from Atwater Street to Veterans Boulevard. as part of the safe routes to school (HB41) CIP

Project Location

Northside of Peachland Boulevard, Atwater Street to Veterans Boulevard.

Latest Updates

The contractor is finishing up driveways, pipe and sidewalk from Veterans Blvd. to Orlando Blvd. grading for sod is being done in that area also.

The watermain work at the intersection of Peachland Blvd. and Harbor Blvd. is complete and it is back open to traffic. They are installing conduits for the new pedestrian signals 

Prep for driveways and sidewalk will contunue from Orlando Blvd. to Harbor Blvd.

Budget

Phase Cost
Design $149,353.00
Construction $2,100,000.00
Total Budget $2,249,353.00
Funding source(s): The HB41 sidewalks are funded by gas tax.

Schedule

Phase Estimated Start Date Forecast Completion Actual Completion
Design Development 10/01/2018 01/31/2020 03/31/2020
Construction 03/08/2021 01/02/2022
Turnover & Closeout 01/03/2022 02/01/2022

Project Phase
Construction

Last Updated
09/09/2021

Project Manager
Raymond Slade

Public Relations
Brian Gleason
Email Public Relations

Sponsor Department
Public Works

Design Engineer/Architect
Johnson Engineering

Construction Contractor
Cougar Contracting