Text Size:
Constructing Structures In Flood Zones
Effective Date: 7/1/1999
Category: PLAN REVIEW
Notice Content
New requirement for building plan approval - effective July 1, 1999

All plans submitted for approval in AE, A, and V flood zones must have (at a minimum) the following information:
  1. A building elevation with the base flood elevation (BFE) shown.
  2. A complete floor to roof peak wall section shown with:
    1. the base flood elevation (BFE) shown
    2. the existing and proposed grade elevation shown
    3. the first habitable floor elevation shown
(based on information provided in the National Geodetic Vertical Datum {NGVD} North American Vertical Datum (NAVD) and Flood Insurance Rate Maps {FIRM})
Splash Category
Please pick a category for the splash banners for this page.
Accordion Menu
Source Type:
URL
Source URL:
/dept/commdev/
Section to Open Index:
1
Please pick a source for the accordion menu on this page:
{MAIN}:use the same menu as the public site home page.
{Local Site}: use a list from the local site.
{URL}: use a list from the URL specified in the URL textbox.
Facebook URL
 
Your Facebook URL (optional)
Twitter URL
 
Your Twitter URL (optional)
YouTube URL
 
Your YouTube URL (optional)
Under Florida Law, email addresses are public records. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing.