Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Public Works Ian Projects

Hurricane Ian Projects

Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

G.C. Herring Park Phase I News Image

G.C. Herring Park Phase I Sales Tax Project

Last Updated: 05/10/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval

GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan. 

Read More

William R Gaines Jr. Veterans Memorial Park Phase II

William R Gaines Jr. Veterans Memorial Park Phase II Sales Tax Project

Last Updated: 05/10/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval

William R. Gaines Jr. Veterans Memorial Park phase II design and construction.

Read More

Atwater Street Sidewalk

Atwater Street Sidewalk Sales Tax Project

Last Updated: 05/08/2024 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

2023 Annual Paving Program News Image

2023 Annual Paving Program Sales Tax Project

Last Updated: 05/07/2024 Category: Roadway Current Phase: Construction

The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.

Read More

Cleveland Avenue Sidewalk

Cleveland Avenue Sidewalk Sales Tax Project

Last Updated: 05/07/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development

The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.

Read More

Ainger Creek Boat Ramp Replacement News Image

Ainger Creek Boat Ramp Replacement

Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development

This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.

Read More

Family Services Center - Phase 2 News Image

Family Services Center - Phase 2 Sales Tax Project

Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout

Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services. 
 

Read More

Mid-County Library Hurricane Repairs

Mid-County Library Hurricane Repairs

Last Updated: 05/01/2024 Category: County Facilities Current Phase: Planning and Project Approval

Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy. 

Read More

Dorchester Street Sidewalk

Dorchester Street Sidewalk

Last Updated: 04/29/2024 Category: Sidewalks Current Phase: Design Development

 Dorchester Street Sidewalk

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us