Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 05/10/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 05/10/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Last Updated: 05/08/2024 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Last Updated: 05/07/2024 Category: Roadway Current Phase: Construction
The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.Last Updated: 05/07/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The BCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.Ainger Creek Boat Ramp Replacement
Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.Family Services Center - Phase 2
Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.Mid-County Library Hurricane Repairs
Last Updated: 05/01/2024 Category: County Facilities Current Phase: Planning and Project Approval
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Last Updated: 04/29/2024 Category: Sidewalks Current Phase: Design Development
Dorchester Street Sidewalk