Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043, #014069

Project Description

These 3 bridges require design services to implement the FDOT maintenance and repair items for each of the respective bridges.  

Bridge #014030 Pellam Boulevard over Auburn Waterway

Bridge #014043 Wintergarden Avenue over Como Waterway

Bridge #014069 O'Hara Drive over Atlantus Waterway

Project Location

Bridge #014030 Pellam Boulevard over Auburn Waterway

Bridge #014043 Wintergarden Avenue over Como Waterway

Bridge #014069 O'Hara Drive over Atlantus Waterway

Latest Updates

BRIDGE #014069 O'HARA DRIVE OVER THE ATLANTUS WATERWAY IS CLOSED FOR AN EMERGENCY REPAIR.  The bridge piling repair work started July 2, once the County, the County’s Structural Consulting Engineer, and the Contractor determined the best solution for the repair process. Since tides, material availability, weather, and concrete cure times have affected the schedule, the completion date for the repair has been pushed back but is on track for a late August completion.

Project Activities for July 2024

The County has approved the Bridge Repair Memorandums for all three bridges and we expect the 60% design plans on July 30, 2024. 

Budget

Phase Cost
Design $189,895
Funding source(s): Greater Port Charlotte MSBU

Schedule

Phase Estimated Start Date Forecast Completion Actual Completion
Design Development 01/16/2024 10/01/2024

Project Phase
Design Development

Last Updated
07/25/2024

Project Manager
Kelly Slaughter

Public Relations
Tracy Doherty
Email Public Relations

Sponsor Department
Public Works

Design Engineer/Architect
Kimley-Horn Engineers