Project Description
The Placida Bridge over Capstan Cut Waterway (#014076) requires engineering design services to provide rehabilitation and maintenance repairs to the bridge structure.Project Location
The Placida Bridge is located in Cape Haze on Cape Haze Drive over the Captsan Cut Waterway between Capstan Drive and Spaniards Drive.
See location map attached.
Latest Updates
This project is complete.
Budget
Phase | Cost |
---|---|
Design | $65,580 |
Construction | $233,461.20 |
Schedule
Phase | Estimated Start Date | Forecast Completion | Actual Completion |
---|---|---|---|
Planning and Approval | 02/21/2022 | 03/31/2022 | |
Design Development | 05/16/2022 | 02/27/2023 | |
Construction | 08/21/2023 | 10/20/2023 | 10/20/2023 |
Supporting Materials
Project Phase
Project Complete
Last Updated
03/29/2024
Project Manager
Kelly Slaughter
Public Relations
Tracy Doherty
Email Public Relations
Sponsor Department
Public Works
Design Engineer/Architect
DRMP
Construction Contractor
V & H Construction