Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Residential Pool Heat Pump

Online application only for heat pumps for pools.

Required Forms & Documents

  • Application for Trade Permit (1 original signed)
  • Owner-Builder Permit Information: Please read this information about what and who may qualify for an Owner-Builder permit. An Owner-Builder Disclosure Statement Form must be completed.
  • Owner-Builder Disclosure Statement (1 original, personally signed at the permit counter): Eligible Owner-Builders must complete this form in person at the time of application. Required by Florida law in order to be exempt from having to be a licensed contractor (sale, rental or lease of the property is prohibited for 1 year from permit completion).

Fees

At Time of Application
  • Building Flat Fee: $90
  • Surcharge: $4

Note: Payments by check should be made payable to either "CCBCC" or Charlotte County Board of County Commissioners. Payments are also accepted by Mastercard or Visa credit or debit cards.

Licenses That Can Pull This Permit Type

  • Owner-Builder: Must not rent or sell the property within one (1) year of completion of the permit.
  • Certified Master Plumber
  • Certified Swimming Pool Class A
  • Certified Swimming Pool Class B
  • Certified Swimming Pool Class C
  • Registered Master Plumber
  • Registered Swimming Pool Class A
  • Registered Swimming Pool Class B

Department Reviews

  • Permit Issuance: At this point, work may commence. The applicant will receive an approved copy of the permit package, and an Inspection Card to be posted at the site.

Typical Inspections

Inspection Type (IVR System Code):
  • Electric Final (935): Made once power is connected to the building, all electrical work has been completed and all electrical trim is installed.
  • Plumbing Final (975): Made after all plumbing work has been completed and all fixtures installed.

Delivering Exceptional Service

Questions? Issues?

Contact Us