Disaster Recovery Site - Amberjack Environmental Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The west boardwalk sustained major structural damage, requiring repairs to stanchions, handrails, bolts, and six deck piles.
Disaster Recovery Site - Alligator Creek N. Access Channel and North Branch Main Canal
Last Updated: 07/30/2026 Category: Disaster Recovery Site
Hurricane Ian caused land-based washouts and runoff into MSBU-maintained navigable waterways and shoaling.
Disaster Recovery Site - Allapatchee Shores Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
Erosion to the kayak launch and stormwater outfall areas. Stormwater outfall retention wall damage.
Disaster Recovery Site - Ainger Creek Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The site suffered significant waterfront and structural damage, including erosion, seawall displacement, and exposed mangrove roots. Several piers were damaged, along with the boat ramp, storm drain protections, and shoreline. Storm surges caused waterway fill, requiring dredging and reinforcement. Additional damage affected parking bumpers, containers, and signage.


