William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 11/26/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, three (3) bocce ball courts with shade canopies, two (2) pickleball courts with lights, one (1) tennis court with lights, and sanitary utility connection to the existing park restroom.Burnt Store Water Reclamation Facility Expansion
Last Updated: 11/25/2025 Category: Utilities Current Phase: Design Development
This expansion project will increase wastewater treatment capacity for the Burnt Store service area.Last Updated: 11/25/2025 Current Phase: Design Development
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.
Last Updated: 11/25/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events.
Port Charlotte Beach Recreation Center
Last Updated: 11/25/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.
Last Updated: 11/20/2025 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.East Port Water Reclamation Facility Expansion
Last Updated: 11/20/2025 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Hillsborough Boulevard Water Main Project
Last Updated: 11/20/2025 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Disaster Recovery Site - Administration Center
Last Updated: 11/19/2025 Category: Disaster Recovery Site
Buildings A and B experienced water intrusion and structural damage. Building A has roof leaks and water damage in multiple rooms and hallways. Building B shows lobby damage, a stained ceiling tile, ripped awning, and damaged louvers. Both buildings have issues with debris in cooling towers and fire alarms in trouble mode. The parking lot sustained lighting damage. Mitigation efforts include drying, demolition, and cleaning, with equipment damage still under evaluation.









