Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
Last Updated: 08/04/2026 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
See attached location map and bridge pictures.
Disaster Recovery Site - Randy Spence Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
High winds and windborne debris damaged two pavilions, including roof, soffit, and fascia damage, as well as impacts to electrical components and lighting fixtures. Structural elements such as wood posts, braces, beams, and metal angles were affected, along with associated PVC conduit and a fluorescent light fixture.
Disaster Recovery Site - Radio Towers
Last Updated: 10/23/2025 Category: Disaster Recovery Site
Disaster Recovery Site - Port Charlotte Beach Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The site experienced erosion and widespread damage to playgrounds, park amenities, boardwalks, sidewalks, pavilions, buildings, lighting, and fencing caused by storm surge, strong winds, flooding, and windborne debris from multiple hurricanes.
Disaster Recovery Site - Placida Road Signage/Lighting
Last Updated: 08/03/2026
This project will consist of replacing all light poles felled by Hurricane Ian.
Disaster Recovery Site - Placida Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged signage, park amenities, lighting, and fencing.
Disaster Recovery Site - Placida Fishing Pier
Last Updated: 08/06/2026 Category: Disaster Recovery Site
Storm surge, strong winds, flooding, and wind borne debris from multiple hurricanes caused severe pier damage resulting in total loss of approximately 6,700 sq ft. timber and composite fishing pier. Erosion of pier approach/walkway, and pier bulkhead with severe loss of rip rap revetment.
Disaster Recovery Site - Pirate Harbor Waterway System
Last Updated: 07/30/2026 Category: Disaster Recovery Site
Hurricane Ian impacted MSBU waterways and caused land-based washouts and runoff into MSBU-maintained navigable waterways. Strong tidal activity also led to shoaling.
Disaster Recovery Site - Piper Road Signage/Lighting
Last Updated: 08/03/2026
This project will consist of replacing all streetlight poles felled by Hurricane Ian.