Project Description
The drainage study will consist of the collection of hydrologic and hydraulic data, an existing conditions stormwater model, and evaluation of conceptual improvements to the existing stormwater management system within the Burnt Store drainage area.Project Location
The Burnt Store area watershed, from the Lee County line, north to generally Notre Dame Blvd. From Charlotte Harbor, east to the upper reaches of the watershed.Budget
Phase | Cost |
---|---|
Engineering | $399700 |