Project Description
Storm damage impacted multiple facilities and infrastructure components. Buildings sustained various damages, including the operations building vent cover blown off the roof, the headworks building door blown off its hinges, the generator building fan cap dislodged and ceiling tiles down, belt press buildings 1 and 2 with broken and damaged belts, and the deep well fiberglass shed with panels ripped off the front and side. Fencing was affected, with sections of the 8-ft. chain-link security fence bent or completely down. Additionally, erosion caused tearing of the EPDM liner in the South Pond (95 MG), which has been moved to a separate project for repair.
Public Relations:
- Stu Gooden
 
Project Managers:
- David Chamberlain
 - Nicholas Reed
 
Project Location
3100 Loveland Blvd. Port Charlotte, FL 33980Latest Updates
| Description of Work | Estimated Start | Estimated Completion | Storm Event | 
|---|---|---|---|
| 
			 Erosion  | 
			Ian | ||
| 
			 Fencing  | 
			Ian | ||
| 
			 Utilities  | 
			Ian | ||
| 
			 Buildings  | 
			6/1/2025 | 12/31/2025 | Ian | 
Budget
| Phase | Cost | 
|---|---|
| Total Budget | $5,900.00 | 



                          
                          
                          
                          
      
                        
      
      
      