Project Description
At El Jobean Fishing Pier, multiple structures and site components were damaged by storm events. The boardwalk pier requires a full replacement with design (100 sq. ft.), and erosion has affected the bulkhead, walkway, and rip-rap approach areas. A paved trail sidewalk (100 linear feet) was also impacted. The fishing pier itself (approx. 9,500 sq. ft.) requires assessment for all components, including gates, poles, and structural elements. Additionally, 10 monofilament bins, 10 trash/recycling containers, and multiple signs, including 10 12"x18" signs to be replaced, one 12"x18" sign to be reset onsite, and 10 12"x18" rules signs require repair or replacement.
Public Relations:
Project Managers:
- Lonne Moore
Project Location
5001 El Jobean Road, Port Charlotte, FL 33953Latest Updates
| Description of Work | Estimated Start | Estimated Completion | Storm Event |
|---|---|---|---|
|
Sidewalks, boardwalks, piers, dock |
8/25/2025 | 9/25/2029 | Ian |
Budget
| Phase | Cost |
|---|---|
| Total Budget | $5,797,750.00 |



