Project Description
Hurricane Ian Waterway Impacts and Restoration: Hurricane Ian impacted MSBU Land-based washouts and runoff into navigable channels Strong tidal influences causing shoaling Reduced draft depths, possible flow restrictions, and navigation hazards Next Steps: A bathymetric survey is needed to assess the extent of shoaling. Based on survey results, dredging will be required to restore waterway depth and ensure safe navigation.
Public Relations:
Project Managers:
- Matthew Logan
 - Zach Patchell
 
Project Location
Various canals and channels within the Ackerman WaterwayLatest Updates
| Description of Work | Estimated Start | Estimated Completion | Storm Event | 
|---|---|---|---|
| 
			 Erosion  | 
			6/1/2026 | 9/30/2026 | Milton | 



                          
                          
                          
                          
      
                        
      
      
      