Project Description
The concession building sustained roof damages, including gutters, soffit panels, and fascia, as well as interior damage to ceilings, walls, equipment, and contents. Fencing damages include an 8-ft chain link section (50 lf), galvanized steel terminal gate post, gate latch assembly, three horizontal support rails, and two gates with HDPE privacy slats. Park building damages include aluminum gutters, galvanized steel roof panels, aluminum soffit with J channels, a roll-up door cover, vent, stucco patching, and 250 sq. ft. of exterior wall repainting. Additional recreational impacts include one dumpster enclosure, six baseball dugout shades, two backstops, and four bleachers.
Public Relations:
- Breanna Benevenga
Project Managers:
- Joseph Romanelli
Project Location
1505 Maracibo St., Port Charlotte, FL 33980Latest Updates
| Description of Work | Estimated Start | Estimated Completion | Storm Event |
|---|---|---|---|
|
Buildings |
Ian | ||
|
Fencing |
Ian | ||
|
Park amenities |
11/10/2025 | 2/10/2026 | Ian |
Budget
| Phase | Cost |
|---|---|
| Total Budget | $12,000.00 |



