Project Description
The office building sustained damage to 45 linear feet of gutter and a downspout, as well as the canopy and frame on its southwest side. The recycling canopy's metal fascia along the entire front is damaged or missing. Additionally, ten metal signs are damaged, and 90 linear feet of plastic privacy/stockade fencing, including poles, have been damaged and require repair or replacement.
Public Relations:
Project Managers:
- Scott Brouillard
 
Project Location
19675 Kenilworth Blvd., Port Charlotte, FL 33954Latest Updates
| Description of Work | Estimated Start | Estimated Completion | Storm Event | 
|---|---|---|---|
| 
			 Fencing  | 
			Ian | ||
| 
			 Block wall  | 
			Ian | ||
| 
			 Buildings  | 
			Ian | 
Budget
| Phase | Cost | 
|---|---|
| Total Budget | $4,051.87 | 



                          
                          
                          
                          
      
                        
      
      
      