Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)

Project Description

The Oyster Creek Bridge sustained damage during Hurricane Ian and has qualified as a Florida Department of Transportation (FDOT) Local Agency Program (LAP) project.

The project involves repairs to Bridge No. 010063 on CR 775 over Oyster Creek to restore it to pre-hurricane conditions. Identified damage includes a displaced light pole at the northwest corner, deterioration of the south bulkhead at the west angle break near piles 2–3, one damaged panel to the west, two panels to the east, and the angle break panel showing undermining up to 4 inches in height with full penetration and evidence of backfill leakage. Additionally, three light poles were downed and require replacement.

Project Location

Oyster Creek Bridge is located on CR775 (Placida Road) over Oyster Creek.

Latest Updates

Project Activity – April 2026

The Pre-Construction meeting is scheduled for April 17, 2026, during this meeting the Notice To Proceed for construction date will be established.

Budget

Phase Cost
Construction $755,761.13
Funding source(s): FDOT Local Agency Project (LAP)

Project Phase
Construction

Last Updated
04/07/2026

Project Manager
Kelly Slaughter

Public Relations
Chad Ray
Email Public Relations

Sponsor Department
Public Works Engineering

Design Engineer/Architect
KCA Engineering (FDOT Contract)

Construction Contractor
Thomas Marine Construction