Project Description
Design and construct a 6' sidewalk with a pedestrian bridge on the west side of Midway Boulevard from US 41 to Lakeview Boulevard as part of Safe Routes to Schools (HB41).Project Location
West side of Midway Boulevard from the US41 intersection South to Lakeview Boulevard.Latest Updates
-
The 100% design plans have been completed.
-
This project will be moving foward to construction. A sidewalk on Ellicott Cir. that was designed and to be constructed as part of the 2014 sales tax referendum will be joined with this project to complete together.
Budget
| Phase | Cost |
|---|---|
| Design | $199,845.00 |
| Construction | $2,484,230.00 |
| Total Budget | $2,684,075.00 |
Schedule
| Phase | Estimated Start Date | Forecast Completion | Actual Completion |
|---|---|---|---|
| Design Development | 09/13/2018 | 11/01/2019 | 10/13/2020 |
Project Phase
Planning and Project Approval
Last Updated
08/27/2026
Project Manager
Raymond Slade
Public Relations
Chad Ray
Email Public Relations
Sponsor Department
Public Works Engineering
Design Engineer/Architect
Johnson Engineering
Construction Contractor
TBD