Project Description
These 2 bridges currently require design services to implement the FDOT maintenance and repair items for each of the respective bridges.
Bridge #014044 Chamberlain Boulevard over Jupiter Waterway.
Bridge #014045 Chamberlain Boulevard over Apollo Waterway.
Project Location
Bridge #014044 Chamberlain Boulevard over Jupiter Waterway.
Bridge #014045 Chamberlain Boulevard over Apollo Waterway.
Latest Updates
Project Activities for April 2026
Bids were opened on March 18, 2026, with Zep Construction identified as the lowest responsive bidder at $1,870,145.46. The contract will require approval by the Board of County Commissioners, after which we will schedule the Pre‑Construction Meeting.
Budget
| Phase | Cost |
|---|---|
| Design | $197,560 |
Schedule
| Phase | Estimated Start Date | Forecast Completion | Actual Completion |
|---|---|---|---|
| Design Development | 01/29/2024 | 10/03/2025 | 12/17/2025 |
Project Phase
Design Development
Last Updated
04/07/2026
Project Manager
Kelly Slaughter
Public Relations
Chad Ray
Email Public Relations
Project Number
2024001656
Sponsor Department
Public Works
Design Engineer/Architect
DRMP Engineering