Disaster Recovery Site - Charlotte County Jail
Last Updated: 08/06/2016 Category: Disaster Recovery Site
The facility suffered extensive storm damage to fences, roofs, HVAC and mechanical systems, electrical and security systems, and critical equipment like generators and water components, necessitating major repairs and replacements.
Disaster Recovery Site - Cultural Center
Last Updated: 08/06/2026 Category: Disaster Recovery Site
Several buildings suffered interior water damage from roof leaks, affecting ceilings, insulation, drywall, flooring, and lighting. Parking and pole lights are leaning, the fire alarm needed resetting, and minor exterior damage occurred to gutters, flashing, and electrical systems. Facility will be demolished and master plan developed for its potential replacement.
Disaster Recovery Site - Darst Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The site experienced erosion and widespread damage to seawall, boat ramp scouring and boarding pier caused by storm surge, strong winds, flooding, and windborne debris from multiple hurricanes.
Disaster Recovery Site - Deep Creek Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
Storm damage affected playground and freestanding shade structures and restroom facilities
Disaster Recovery Site - East Port Environmental Campus
Last Updated: 08/07/2026 Category: Disaster Recovery Site Category: Utilities
Storm damage affected multiple facilities and caused major equipment failures.
Disaster Recovery Site - East Port Water Reclamation Facility
Last Updated: 11/10/2025 Category: Disaster Recovery Site
Hurricane Ian damaged multiple facilities, fencing and infrastructure components at the East Port Water Reclamation Facility.
Disaster Recovery Site - Edgewater Boulevard Signage/Lighting
Last Updated: 08/03/2026
This project will consist of replacing all light poles felled by Hurricane Ian.
Disaster Recovery Site - El Jobean Fishing Pier
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The area sustained extensive pier damage resulting in total loss of timber and composite fishing pier. Erosion of pier approach/walkway, and pier bulkhead with severe loss of rip rap revetment.
Disaster Recovery Site - Englewood Beach and Chadwick Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The site experienced erosion and widespread damage to playgrounds, park amenities, boardwalks, sidewalks, pavilions, buildings, lighting, asphalt, curbing and fencing caused by storm surge, strong winds, flooding, and wind borne debris from multiple hurricanes.