Disaster Recovery Site - Lemon Bay Sunrise Rotary Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The site experienced erosion and widespread damage to playgrounds, park amenities, boarding piers, sidewalks, floating ADA kayak/canoe launch, restroom building, lighting, and fencing caused by storm surge, strong winds, flooding, and windborne debris from multiple hurricanes. The floating ADA canoe/kayak launch and pedestrian bridge require replacement and the boarding pier requires partial replacement.
Disaster Recovery Site - Live Oak Point Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
Storm surges caused severe erosion, washouts, and structural damage. Restroom foundations were undermined, and multiple piers and boardwalks need full concrete replacement. Sidewalks, pavers, rip rap, seawalls, and erosion control structures were damaged. Additional impacts include damaged posts, benches, signage, fencing, and trash containers.
Disaster Recovery Site - Maracaibo Kidspace Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The concession and park buildings sustained roof, gutter, soffit, and interior damages. Fencing components and gates were damaged, along with a dumpster enclosure, baseball dugout shades, backstops, and bleachers. Exterior wall repairs and repainting are also needed.
Disaster Recovery Site - McGuire Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.
Disaster Recovery Site - Mid County Regional Library
Last Updated: 08/06/2026 Category: Disaster Recovery Site
Roof leaks caused severe water damage to the library’s interior, requiring immediate content removal. Mitigation included drying, temporary roofing, and partial demolition. Additional damage includes 37 missing/damaged landscape lights and damaged sections of fencing. Ongoing stabilization and cleanup are needed.
Disaster Recovery Site - Mid-County Recycling Center
Last Updated: 08/06/2026 Category: Disaster Recovery Site
The office building and recycling canopy sustained gutter, downspout, canopy, and fascia damage. Ten metal signs and 90 feet of privacy fencing were also damaged and need repair or replacement.
Disaster Recovery Site - Ollie's Pond
Last Updated: 08/06/2026 Category: Disaster Recovery Site
High winds and windborne debris damaged and removed park entry signs, signage and environmental park boardwalk structures including stanchions, handrails, decking and support structures.
Disaster Recovery Site - Oyster Creek Environmental Park
Last Updated: 08/06/2026 Category: Disaster Recovery Site
High winds and windborne debris damaged environmental park boardwalk structures including stanchions, handrails, decking and support structures.
Disaster Recovery Site - Placida Fishing Pier
Last Updated: 08/06/2026 Category: Disaster Recovery Site
Storm surge, strong winds, flooding, and wind borne debris from multiple hurricanes caused severe pier damage resulting in total loss of approximately 6,700 sq ft. timber and composite fishing pier. Erosion of pier approach/walkway, and pier bulkhead with severe loss of rip rap revetment.