Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

2024 Annual Paving Program

2024 Annual Paving Program

Last Updated: 08/03/2026 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.

Read More

2024 Road and Bridge Paving Program News Image

2024 Road and Bridge Paving Program

Last Updated: 08/03/2026 Category: Roadway Current Phase: Construction

2024 Road and Bridge Paving Program

Read More

2025 Annual Road and Bridge/MSBU Paving Program News Image

2025 Annual Road and Bridge/MSBU Paving Program

Last Updated: 08/03/2026 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.

Read More

2025 Rotonda West/Pioneer Trail Annual Paving Program News Image

2025 Rotonda West/Pioneer Trail Annual Paving Program

Last Updated: 08/03/2026 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.

Read More

Ackerman Wastewater Expansion News Image

Ackerman Wastewater Expansion

Last Updated: 07/13/2026 Category: Utilities Current Phase: Construction

Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.

Read More

Ainger Creek Boat Ramp Replacement News Image

Ainger Creek Boat Ramp Replacement

Last Updated: 07/10/2026 Category: Parks And Recreation Current Phase: Design Development

This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.

Read More

Ainger Creek Bridge - Emergency Repair

Ainger Creek Bridge - Emergency Repair

Last Updated: 08/04/2026 Category: Bridges Current Phase: Construction

Ainger Creek Bridge - Emergency Repair

Read More

Allapatchee Shores Park - Stormwater and Parking Enhancements

Allapatchee Shores Park - Stormwater and Parking Enhancements

Last Updated: 08/06/2026 Category: Parks And Recreation Current Phase: Construction

Allapatchee Shores Park - Stormwater and Parking Enhancements

Read More

Alligator Creek Maintenance Dredge News Image

Alligator Creek Maintenance Dredge

Last Updated: 07/30/2026 Category: Coastal Current Phase: Design Development

Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.

Read More

View Full Projects Map

Delivering Exceptional Service

Questions? Issues?

Contact Us