Disaster Recovery Site - Cultural Center
Last Updated: 01/05/2026 Category: Disaster Recovery Site
Several buildings suffered interior water damage from roof leaks, affecting ceilings, insulation, drywall, flooring, and lighting. Parking and pole lights are leaning, the fire alarm needed resetting, and minor exterior damage occurred to gutters, flashing, and electrical systems. Facility will be demolished and master plan developed for its potential replacement.
Disaster Recovery Site - Harbour Heights Mealsite
Last Updated: 01/05/2026 Category: Disaster Recovery Site
Storm damage includes building siding, soffits, and roof issues, fencing damage, and a broken storage sign.Ainger Creek Boat Ramp Replacement
Last Updated: 12/09/2025 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Disaster Recovery Site - Englewood Interconnect Water Booster Station
Last Updated: 12/08/2025 Category: Disaster Recovery Site Category: Utilities
Hurricane Ian damaged the Englewood water booster station.Hillsborough Boulevard Water Main Project
Last Updated: 12/08/2025 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Lakeview/Midway Wastewater Expansion
Last Updated: 12/08/2025 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Completed 12/05/2025 Category: Parks And Recreation
Creation of park master plan and phase 1 development
The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season.
Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)
Last Updated: 12/02/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 12/02/2025 Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge Replacement