Project Status Updates

Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Port Charlotte Beach Pool News Image

Port Charlotte Beach Pool Sales Tax Project

Last Updated: 08/22/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The proposed pool will be 54% larger than the existing pool (140,000 vs. 65,000 gallons) and include lap lanes. The facility will have a check-in station, locker rooms, multiple restrooms, office space, a break room, storage areas, and restrooms for the pier. 

Read More

Port Charlotte Beach Recreation Center News Image

Port Charlotte Beach Recreation Center Sales Tax Project

Last Updated: 08/22/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction

The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages. The new Recreation Center will be constructed in the same area as the previous facility, it will be approximatley 20K square feet to accomodate the growth and needs of the community for generations to come. The new facility will primarily focus on events and meeting space as well as improved outdoor spaces that compliment the views of the harbor. The new facility will be elevated and hardend to a code plus standard to be more resilient against future storms. The new facility will have a full serving kitchen, a dividable meeting room, a large event room, office spaces for staff and an auxiliary conference room available to the public. Outdoor amentities will include an elevated structure that supports walking and visibilty under the facility, a covered drop off area and exterior deck space facing the water for enhanced views and events.  

Read More

Rotonda Bridge Rehabilitations (Phase 4 and 5)

Rotonda Bridge Rehabilitations (Phase 4 and 5)

Last Updated: 08/22/2025 Category: Bridges Current Phase: Construction

Rotonda Bridge Rehabilitations - Construction Phase 4 and 5 - Bridges 014060, 014063, 014100, 014101, 014104 and 014107

Read More

Rotonda MSBU Bridge Rehabilitations (6)

Rotonda MSBU Bridge Rehabilitations (6)

Last Updated: 08/22/2025 Category: Bridges Current Phase: Construction

Rotonda MSBU Bridge Rehabilitations (6) - #014105 and #014106

Read More

South Gulf Cove Bridge Rehabilitations

South Gulf Cove Bridge Rehabilitations

Last Updated: 08/22/2025 Category: Bridges Current Phase: Turnover and Closeout

South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)

Read More

South Gulf Cove FY24 Bridge Rehabilitations

South Gulf Cove FY24 Bridge Rehabilitations

Last Updated: 08/22/2025 Category: Bridges Current Phase: Design Development

South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072

Read More

Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 08/22/2025 Category: Drainage Current Phase: Planning and Project Approval

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Bayshore Live Oak Park - West Fishing Pier

Bayshore Live Oak Park - West Fishing Pier

Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval

Total replacement of the western fishing pier at Bayshore Live Oak Park.

Read More

Bissett Park

Bissett Park

Last Updated: 08/21/2025 Category: Parks And Recreation Current Phase: Construction

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

Read More