Disaster Recovery Site - Public Works JB Yard
Last Updated: 11/19/2025 Category: Disaster Recovery Site
The gates sustained damage, and associated access control systems, including cameras, were non-functional.
Disaster Recovery Site - Public Works Maintenance and Operations
Last Updated: 11/19/2025 Category: Disaster Recovery Site
The site sustained minor damage to the soffit and fascia of one carport. Fencing includes damage to two 8 ft. chain link security fences and three automatic gates at the fuel house.
Disaster Recovery Site - Tamiami Trail South Access Signage/Lighting
Last Updated: 11/19/2025
This project will consist of replacing all light pole felled by Ian
Disaster Recovery Site - Veterans Boulevard Signage/Lighting
Last Updated: 11/19/2025
This project will consist of replacing all light pole felled by Ian
Disaster Recovery Site - West County Mini Transfer Station
Last Updated: 11/19/2025 Category: Disaster Recovery Site
Disaster Recovery Site - Winchester Boulevard Signage/Lighting
Last Updated: 11/19/2025 Category: Disaster Recovery Site
This project will consist of replacing all light pole felled by IanRiverside Boat Ramp Replacement
Last Updated: 11/19/2025 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 11/19/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Turnover and Closeout
Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .
Disaster Recovery Site - Tom Adams Bridge
Last Updated: 11/17/2025 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.