Willmington Boulevard Sidewalk
Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Willmington Boulevard Sidewalk
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 07/15/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Weir Inspection and Repair Design
Last Updated: 07/31/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control structures to determine the extent of the deficiencies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Waterway Hurricane Debris Removal-Grant Funded
Last Updated: 07/31/2026 Category: Drainage Current Phase: Turnover and Closeout
Remove hurricane debris from approximately 37 miles of navigable waterways throughout the county.Last Updated: 06/12/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.Washington Loop Road over Shell Creek and Myrtle Slough Bridge Rehabilitations
Last Updated: 08/04/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridges over Shell Creek and Myrtle SloughWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 08/04/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWashington Loop over Prairie Creek Bridge Replacement
Last Updated: 08/03/2026 Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge Replacement