Disaster Recovery Site - Fire Station 7
Last Updated: 11/19/2025 Category: Disaster Recovery Site
The building suffered interior and exterior damage, including missing ceiling tiles, a blown-off vent fan, a roof hole, missing downspouts, and irrigation system damage. Mitigation involved assessments, sampling, and restoration work, with ongoing cleanup possibly revealing further contents damage.
Disaster Recovery Site - Fire Station 8
Last Updated: 11/19/2025 Category: Disaster Recovery Site
Significant damage affected equipment, roof, ceilings, walls, floors, and doors. The diesel storage tank is nonfunctional due to electrical damage, and minor signage damage includes a missing letter.
Disaster Recovery Site - Fleet
Last Updated: 11/19/2025 Category: Disaster Recovery Site
Water intrusion from the southwest wall, damaged roof, and gutters caused interior and fixture damage. Garage roll-up doors and the perimeter fence were also damaged, with possible motor problems.
Disaster Recovery Site - Gasparilla Road Signage/Lighting
Last Updated: 11/19/2025
This project will consist of replacing all light pole felled by Ian
Disaster Recovery Site - Harbor Boulevard Signage/Lighting
Last Updated: 11/19/2025
This project will consist of replacing all light pole felled by Ian
Disaster Recovery Site - Harbour Heights Mealsite
Last Updated: 11/19/2025 Category: Disaster Recovery Site
Storm damage includes building siding, soffits, and roof issues, fencing damage, and a broken storage sign.
Disaster Recovery Site - Historic Courthouse
Last Updated: 11/19/2025 Category: Disaster Recovery Site
The courthouse sustained extensive storm damage, including basement flooding, sinkholes, electrical issues, an inoperable elevator, and water intrusion on multiple floors. Interior damage affected offices, fixtures, and contents, with significant losses in the basement.
Disaster Recovery Site - Jones Loop Road Signage/Lighting
Last Updated: 11/19/2025
This project will consist of replacing all light pole felled by Ian
Disaster Recovery Site - Justice Center
Last Updated: 11/19/2025 Category: Disaster Recovery Site
The building suffered roof damage and water intrusion across five floors, affecting about 7,500 sq. ft. of carpet. Emergency measures included roof repair, water removal, demolition, cleaning, and drying. The fire alarm is in trouble mode and needs resetting