Disaster Recovery Site - Veterans Boulevard Signage/Lighting
Last Updated: 08/03/2026
This project will consist of replacing all light poles felled by Hurricane Ian.
Disaster Recovery Site - Winchester Boulevard Signage/Lighting
Last Updated: 08/03/2026 Category: Disaster Recovery Site
This project will consist of replacing all light poles felled by Hurricane Ian.
Don Pedro/Knight Island Beach Renourishment
Last Updated: 08/03/2026 Category: Coastal Current Phase: Planning and Project Approval
The is a major renourishment of the Don Pedro/Knight Island shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkLast Updated: 08/03/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayGasparilla Road Sidewalk (Boca Grande)
Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Design Development
This project was requested by the CCBOCCGasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 08/03/2026 Current Phase: Planning and Project Approval
Gillot Boulevard Landscape and Irrigation Project
Last Updated: 08/03/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove Sidewalks