Last Updated: 11/17/2025 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.Rampart Boulevard Sidewalk Phase 3
Last Updated: 11/17/2025 Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk phase 3Completed 11/17/2025 Category: Coastal
The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.
Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 11/17/2025
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 11/17/2025 Category: Disaster Recovery Site
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Ballfield LED Lighting Conversion-ACDRP Football Fields
Last Updated: 11/14/2025 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-ACDRP Football FieldsBallfield LED Lighting Conversion-Carmalita Park Horse Arena
Last Updated: 11/14/2025 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-Carmalita Park Horse ArenaMid-County Library Hurricane Repairs
Last Updated: 11/12/2025 Category: County Facilities Current Phase: Construction
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.
Disaster Recovery Site - Burnt Store Water Facility
Last Updated: 11/10/2025 Category: Disaster Recovery Site Category: Utilities
Hurricane Ian damaged many mechanical components and fencing to the Burnt Store Water Treatment Plant.