Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Manatee Exclusion Grates

Manatee Exclusion Grates Disaster Recovery Project Site

Last Updated: 12/03/2025 Category: Disaster Recovery Site Category: Drainage

Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed.  These grates help prevent manatees from getting stuck in the culvert.  There are 35 culvert locations throughout the county that will have these grates installed.

Read More

2023 Annual Paving Program News Image

2023 Annual Paving Program

Completed 12/02/2025 Category: Roadway

The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.

Read More

2024 Annual Paving Program

2024 Annual Paving Program

Last Updated: 12/02/2025 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.

Read More

2024 Road and Bridge Paving Program News Image

2024 Road and Bridge Paving Program

Last Updated: 12/02/2025 Category: Roadway Current Phase: Construction

2024 Road and Bridge Paving Program

Read More

2025 Annual Road and Bridge/MSBU Paving Program News Image

2025 Annual Road and Bridge/MSBU Paving Program

Last Updated: 12/02/2025 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.

Read More

2025 Rotonda West/Pioneer Trail Annual Paving Program News Image

2025 Rotonda West/Pioneer Trail Annual Paving Program

Last Updated: 12/02/2025 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.

Read More

Airport Road Sidewalk

Airport Road Sidewalk Sales Tax Project

Last Updated: 12/02/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval

Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP

Read More

Alligator Creek Maintenance Dredge News Image

Alligator Creek Maintenance Dredge

Last Updated: 12/02/2025 Category: Coastal Current Phase: Design Development

Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 12/02/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us