Mid-County Library Hurricane Repairs
Last Updated: 04/28/2026 Category: County Facilities Current Phase: Turnover and Closeout
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Northwest Port Charlotte Maintenance Dredging - Exterior
Last Updated: 04/28/2026 Category: Coastal Current Phase: Planning and Project Approval
Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU. The project may also include the Juno Waterway.
Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 04/28/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 04/28/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
Last Updated: 04/28/2026 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 04/28/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Lakeview/Midway Wastewater Expansion
Last Updated: 04/27/2026 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Don Pedro/Knight Island Beach Renourishment
Last Updated: 04/24/2026 Category: Coastal Current Phase: Planning and Project Approval
The is a major renourishment of the Don Pedro/Knight Island shoreline. This project is inclusive of the Storm Damage Repairs and will include State and Federal dollars encumbered for disaster recovery.Last Updated: 04/24/2026 Current Phase: Design Development
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.