Disaster Recovery Site - Tringali Park
Last Updated: 05/07/2026 Category: Disaster Recovery Site
The site sustained storm damage to several recreational facilities and buildings.
Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 05/07/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Englewood East Amenity Replacement
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
Replacement and improvement of playground equipment and shade structure that was damaged during Hurricane Ian along with the installation of an additional pavilion and drinking fountain for community use.
Last Updated: 05/07/2026 Category: Disaster Recovery Site Category: Drainage
Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed. These grates help prevent manatees from getting stuck in the culvert. There are 37 culvert locations throughout the county that will have these grates installed.Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.Last Updated: 05/07/2026 Current Phase: Design Development
Replacement of boardwalk at Oyster Creek Environmental Park.Riverside Boat Ramp Replacement
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
South County Regional Park Playground Replacement
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Design Development
Replacement of the existing playground equipment that has reached it's of life cycle. This will include the 5-12 and 2-5 ages play structures. The existing shade canopies will remain and be incorporated into the new equipment layout. Final design's from 3 vendors will be shared with the community so they can vote on the most liked concept. The design with the most votes is what will be installed.Waterway Hurricane Debris Removal-Grant Funded
Last Updated: 05/07/2026 Current Phase: Construction
Remove hurricane debris from approximately 37 miles of navigable waterways througout the county.