Riverside Drive Road Crossing Pipe Replacements
Last Updated: 08/03/2026 Category: Roadway Current Phase: Planning and Project Approval
Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor DriveRiverside Boat Ramp Replacement
Last Updated: 05/07/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Rio Villa Bridge Rehabilitation
Last Updated: 08/04/2026 Category: Bridges Current Phase: Design Development
Rio Villa Bridge RehabilitationRampart Boulevard Sidewalk Phase 3
Last Updated: 08/03/2026 Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk phase 3
Rampart Boulevard Sidewalk Phase 1 and 2
Last Updated: 08/03/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Boulevard Sidewalk Phase 1 and 2
Port Charlotte Beach Recreation Center
Last Updated: 08/07/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The project replaces the existing facility that has reached its end of life and suffered significant Hurricane damages.
Last Updated: 08/07/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
The existing pool at Port Charlotte Beach Park will be replaced with a community pool suitable for lap swimming, aerobic exercise, therapy, and other special events.
Port Charlotte Beach Park Shoreline Stabilization
Last Updated: 08/06/2026 Category: Coastal Category: Parks And Recreation Current Phase: Design Development
Port Charlotte Beach Park Shoreline Stabilization
Placida West Boat Ramp Expansion
Last Updated: 07/15/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.