Public Works Ian Projects

Disaster Recovery Projects

Learn about the ongoing repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by storms, including hurricanes Ian, Helene and Milton.

Disaster Recovery Projects Dashboard
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park
Weir Inspection and Repair Design

Weir Inspection and Repair Design

Last Updated: 08/22/2025 Category: Drainage Current Phase: Planning and Project Approval

The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged.  The cause of the damage is not known.  An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.  

Read More

Lakeview/Midway Wastewater Expansion

Lakeview/Midway Wastewater Expansion

Last Updated: 08/21/2025 Category: Utilities Current Phase: Design Development

This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system. 

Read More

Flamingo/Edgewater Widening News Image

Flamingo/Edgewater Widening Sales Tax Project

Last Updated: 08/20/2025 Category: Roadway Current Phase: Design Development

Flamingo/Edgewater Widening

Read More

Gasparilla Road Intersections Signalization

Gasparilla Road Intersections Signalization

Last Updated: 08/20/2025 Category: Roadway Current Phase: Design Development

Signalization project  for the intersection of Gasparilla Road and Rotonda East Boulevard and the intersection of Gasparilla Road and Ingram/Ingraham Boulevards

Read More

Kings Hwy Harborview Rd Intersection Improvements

Kings Hwy Harborview Rd Intersection Improvements

Last Updated: 08/20/2025 Category: Roadway Current Phase: Construction

Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening. 

Read More

Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance

Mid-County Mini Transfer & Recycling Facility Roadway Reconfiguration and Truck Entrance

Last Updated: 08/20/2025 Category: Roadway Current Phase: Design Development

The design, permitting, and construction of a new gated access trucking road into the mini-transfer station. 

Read More

Riverside Boat Ramp Replacement News Image

Riverside Boat Ramp Replacement

Last Updated: 08/20/2025 Category: Parks And Recreation Current Phase: Design Development

As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues. 

Read More

Sheriff District 4 HQ, Training Facility and K9 Unit News Image

Sheriff District 4 HQ, Training Facility and K9 Unit Sales Tax Project

Last Updated: 08/20/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Turnover and Closeout

Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .

Read More

Harold Avenue Generator Mitigation Grant

Harold Avenue Generator Mitigation Grant

Last Updated: 08/18/2025 Current Phase: Turnover and Closeout

This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center. 

Read More