Learn about the going repairs county departments are making to county roads, rights of ways, facilities, beaches, parks and libraries from damage caused by hurricanes Ian, Helene and Milton.
Englewood Beach Port Charlotte Beach Park Bayshore Live Oak Park Public Works Ian Projects Facilities RepairsManasota Key Sidewalk, Lighting & Landscaping
Last Updated: 07/02/2025 Category: Sidewalks Category: Landscape Category: Other Current Phase: Design Development
Gulf Boulevard Sidewalk, Lighting & LandscapingMidway Boulevard Sidewalk (HB41)
Last Updated: 07/02/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.Last Updated: 07/02/2025 Category: Coastal Current Phase: Design Development
Design, permit, and construct a maintenance dredge event within the Pirate Harbor waterway system. This project will include construction oversight with post dredge bathymetric surveys for project certification. This project is for approximately the landward half of the access channel inland connector canals. The finger canals are not included in this project.
Quesada Avenue Sidewalk and Pedestrian Signals
Last Updated: 07/02/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Construction
Quesada Avenue sidewalk and pedestrian signals
Rampart Blvd. Sidewalk phase 1
Last Updated: 07/02/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Blvd. Sidewalk phase 1
Rampart Blvd. Sidewalk phase 2
Last Updated: 07/02/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
Rampart Blvd. Sidewalk phase 2Rampart Blvd. Sidewalk phase 3
Last Updated: 07/02/2025 Category: Sidewalks Current Phase: Design Development
Rampart Blvd. Sidewalk phase 3South Gulf Cove Parallel Locks Project
Last Updated: 07/02/2025 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 06/27/2025 Category: Roadway Current Phase: Design Development
Flamingo/Edgewater Widening