Disaster Recovery Site - South County Annex
Last Updated: 05/26/2026 Category: Disaster Recovery Site
Disaster Recovery Site - West County Mini Transfer Station
Last Updated: 05/26/2026 Category: Disaster Recovery Site
Disaster Recovery Site - West Port Water Reclamation Facility
Last Updated: 05/26/2026 Category: Disaster Recovery Site
Hurricane Ian caused significant damage throughout the wastewater treatment plant.
Disaster Recovery Site - Zemel Road Landfill
Last Updated: 05/26/2026 Category: Disaster Recovery Site
Last Updated: 05/26/2026 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkLast Updated: 05/26/2026 Category: Sidewalks Current Phase: Planning and Project Approval
Gasparilla Pines Boulevard PathwayGasparilla Road Sidewalk (Boca Grande)
Last Updated: 05/26/2026 Category: Sidewalks Current Phase: Design Development
This project was requested by the CCBOCCGillot Boulevard Landscape and Irrigation Project
Last Updated: 05/26/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Last Updated: 05/26/2026 Category: Sidewalks Current Phase: Design Development
Gulf Cove Sidewalks





