Disaster Recovery Site - William R Gaines Jr. Veterans Memorial Park
Last Updated: 05/27/2026 Category: Disaster Recovery Site
High winds, windborne debris and localized flooding damaged playgrounds, park amenities, sidewalks, pavilions, buildings, lighting, and fencing.Last Updated: 05/27/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, one basketball court, fitness hub with shade structure, multi-purpose field area and exercise trail.Greater Port Charlotte MSBU Bridge Rehabilitations
Last Updated: 05/27/2026 Category: Bridges Current Phase: Construction
Greater Port Charlotte MSBU Bridge Rehabilitations - #014030, #014043 and #014069Mid-County Library Hurricane Repairs
Completed Category: County Facilities
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 05/27/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge Replacement
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 05/27/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Construction
William R. Gaines Jr. Veterans Memorial Park Phase II design and construction to include one (1) large pavilion, two (2) pickleball courts and sanitary utility connection to the existing park restroom.Last Updated: 05/26/2026 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.Burnt Store Road East-West Connector
Last Updated: 05/26/2026 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.
Disaster Recovery Site - Airport Road Annex
Completed Category: Disaster Recovery Site
Several county buildings sustained various damages, including torn canopies, roof and siding damage, and structural impacts. Notably, the old Transit building lost its canopy, satellite dish, and antenna. The Supervisor of Elections facilities experienced roof, fascia, and siding damage.