Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 04/21/2023 Category: County Facilities Current Phase: Complete
Relocate the transit services from Airport Road Annex to a central facility located off Veterans Boulevard. The facility will provide admin support, operations & dispatch personnel.
Last Updated: 04/11/2023 Category: Utilities Current Phase: Complete
This project involves removing and replacing the sewer force mains within the road right of ways and utility easements.Sunshine Lake/Sunrise Waterway Monitoring Program
Last Updated: 03/07/2023 Category: Other Current Phase: Construction
This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway.El Jobean East Wastewater Expansion
Last Updated: 11/15/2022 Category: Utilities Current Phase: Complete
Construction of a wastewater collection system to service approximately 300 properties with sewer service, a water booster pump station and a sewer vacuum station.Quesada Boulevard Wastewater Force Main Replacement
Last Updated: 07/19/2022 Category: Utilities Current Phase: Complete
The project will replace approximately 780 linear feet of 12-inch wastewater force main and approximately 1,841 linear feet of 20-inch wastewater force main that runs along Quesada Boulevard from the Master Lift Station to the Lion Heart waterway.
Family Services Center - Phase 1
Last Updated: 03/21/2022 Category: County Facilities Category: Sales Tax Funded Current Phase: Complete
Design and construct a new Family Services facility to replace the existing facilty as part of a phased master plan approach. The project is the last Tier 1 sales tax project from the 2014 sales tax initiative.Loveland Grand Master Lift Station and 48-inch Gravity Interceptor
Last Updated: 03/10/2022 Category: Utilities Current Phase: Complete
This project is constructing a master lift station and a major 48-inch wastewater gravity interceptor to transfer wastewater to the East Port Water Reclamation Facility (WRF).Easy Street Wastewater Force Main Replacement
Last Updated: 01/03/2022 Category: Utilities Current Phase: Complete
This project will replace of approximately 1,980 linear feet of 6-inch wastewater force main.Last Updated: 12/22/2021 Category: Utilities Current Phase: Complete
This project includes the construction of the replacement of Lift Station #2. Work also includes replacements of the 6" wastewater forcemain and 8" watermain along Conway Boulevard.