Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
El Jobean East Wastewater Expansion
Last Updated: 11/15/2022 Category: Utilities Current Phase: Complete
Construction of a wastewater collection system to service approximately 300 properties with sewer service, a water booster pump station and a sewer vacuum station.Quesada Boulevard Wastewater Force Main Replacement
Last Updated: 07/19/2022 Category: Utilities Current Phase: Complete
The project will replace approximately 780 linear feet of 12-inch wastewater force main and approximately 1,841 linear feet of 20-inch wastewater force main that runs along Quesada Boulevard from the Master Lift Station to the Lion Heart waterway.Family Services Center - Phase 1
Last Updated: 03/21/2022 Category: County Facilities Category: Sales Tax Funded Current Phase: Complete
Design and construct a new Family Services facility to replace the existing facilty as part of a phased master plan approach. The project is the last Tier 1 sales tax project from the 2014 sales tax initiative.Loveland Grand Master Lift Station and 48-inch Gravity Interceptor
Last Updated: 03/10/2022 Category: Utilities Current Phase: Complete
This project is constructing a master lift station and a major 48-inch wastewater gravity interceptor to transfer wastewater to the East Port Water Reclamation Facility (WRF).Easy Street Wastewater Force Main Replacement
Last Updated: 01/03/2022 Category: Utilities Current Phase: Complete
This project will replace of approximately 1,980 linear feet of 6-inch wastewater force main.Last Updated: 12/22/2021 Category: Utilities Current Phase: Complete
This project includes the construction of the replacement of Lift Station #2. Work also includes replacements of the 6" wastewater forcemain and 8" watermain along Conway Boulevard.Last Updated: 11/05/2021 Category: County Facilities Current Phase: Complete
This project includes renovation and remodeling of the existing Justice Center, primarily within the existing footprint of the building. This work is being constructed in fourteen phases, affecting three of the five floors throughout the facility, plus site related security enhancements.
Port Charlotte Beach Sailing Center
Last Updated: 11/05/2021 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Complete
This 2014 Tier II Sales Tax Extension project will provide a small boat maintenance garage and workshop area, covered pavilion, secure covered and uncovered boat storage, and required utilities and infrastructure.
Cape Haze Drive Reclaimed Water and Wastewater Force Main
Last Updated: 07/29/2021 Category: Utilities Current Phase: Complete
This project involves upsizing the existing 6" sewer lines to 12" on Cape Haze Drive and adding new 16" reclaimed water lines for future customers.