Disaster Recovery Site - Winchester Boulevard Signage/Lighting
Last Updated: 07/23/2026 Category: Disaster Recovery Site
This project will consist of replacing all light poles felled by Hurricane Ian.
Indian Springs Cemetery Bank Stabilization
Last Updated: 07/23/2026 Category: Other Current Phase: Construction
Repair of the bank adjacent to Alligator Creek due to erosion caused by Hurricane Irma in 2017Last Updated: 07/20/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.
2025 Annual Road and Bridge/MSBU Paving Program
Last Updated: 07/20/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.2025 Rotonda West/Pioneer Trail Annual Paving Program
Last Updated: 07/20/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.
Atwater Street Sidewalk Project
Last Updated: 07/20/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Initiative.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 07/20/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksChamberlain Boulevard Sidewalk
Last Updated: 07/20/2026 Category: Sidewalks Current Phase: Design Development
NWPC Chamberlain Blvd. Sidewalk
Cleveland Avenue Sidewalk Project
Last Updated: 07/20/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Cleveland as part of the 2020 Sales Tax Extension.