Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

2025 Rotonda West/Pioneer Trail Annual Paving Program News Image

2025 Rotonda West/Pioneer Trail Annual Paving Program

Last Updated: 12/02/2025 Category: Roadway Current Phase: Construction

The purpose of this project is to maintain the roadway system of Charlotte County in the Rotonda West District and Pioneer Trail.

Read More

Airport Road Sidewalk

Airport Road Sidewalk Sales Tax Project

Last Updated: 12/02/2025 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval

Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP

Read More

Alligator Creek Maintenance Dredge News Image

Alligator Creek Maintenance Dredge

Last Updated: 12/02/2025 Category: Coastal Current Phase: Design Development

Surveying, design, permitting, and construction oversight for the maintenance dredging of the Alligator Creek main channel.

Read More

Atwater Street Sidewalk Project

Atwater Street Sidewalk Project Sales Tax Project

Last Updated: 12/02/2025 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development

The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.

Read More

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Last Updated: 12/02/2025 Category: Bridges Current Phase: Construction

Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020

Read More

Biscayne Bridge Rehabilitations

Biscayne Bridge Rehabilitations

Completed 12/02/2025 Category: Bridges

Road and Bridge FY23 Bridge Rehabilitations - #014049 and #014050

Read More

Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek

Bridge Rehabilitations for CR775 over Buck Creek and Oyster Creek

Completed 12/02/2025 Category: Bridges

Road and Bridge FY23 Bridge Rehabilitations - #010061 and #010063

Read More

Bridge Scour Study and Countermeasures

Bridge Scour Study and Countermeasures

Last Updated: 12/02/2025 Category: Bridges Current Phase: Design Development

Bridge Scour Study and Countermeasures.

Read More

Buena Vista Waterways Dredging Project

Buena Vista Waterways Dredging Project

Last Updated: 12/02/2025 Category: Coastal Current Phase: Construction

Surveying, design, permitting, and construction oversight for dredging of parts of the Sunrise, George Road, and the Gardner Drive channels for the Buena Vista Waterway MSBU.  The project also includes a beach sand replenishment component at the Charlotte County Beach Park, Bayshore Live Oak Park, and the Chester Roberts Park.   

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us