Last Updated: 02/13/2026 Category: Disaster Recovery Site Category: Drainage
Outfall culverts that were replaced or repaired due to hurricane damage are required to have a manatee exclusion grate installed. These grates help prevent manatees from getting stuck in the culvert. There are 37 culvert locations throughout the county that will have these grates installed.Last Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Construction
Creation of a master plan through the park design process and phase 1 development.Last Updated: 02/13/2026 Category: Drainage Current Phase: Planning and Project Approval
Removal and disposal of all nuisance and exotic vegetation and trash from approximately 17 acres of Oyster Creek.
South County Regional Park Improvements-Final Phase
Last Updated: 02/13/2026 Category: Parks And Recreation Current Phase: Design Development
Weir Inspection and Repair Design
Last Updated: 02/13/2026 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Riverside Boat Ramp Replacement
Last Updated: 02/12/2026 Category: Parks And Recreation Current Phase: Construction
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Last Updated: 02/11/2026 Category: Parks And Recreation Current Phase: Design Development
The Bayshore Grass Parking area was severely damaged by Hurricane Milton. A new assessment is required to confirm that the previous design will still meet current project needs. Submittals have been received, and an engineer of record has been confirmed. Contract negotiations are in progress, and once final designs are approved, the County will advertise the project for construction bids to begin reestablishing and hardening the parking area.Last Updated: 02/11/2026 Category: Drainage Current Phase: Planning and Project Approval
The Burnt Store Area Drainage Study seeks to identify areas that flood now, and areas that are expected to flood once the watershed is built out. The study will recommend conceptual improvements to alleviate this flooding.Southwest Landfill Operations Building Zemel Rd
Last Updated: 02/11/2026 Current Phase: Planning and Project Approval