Peace River Shores Boulevard Road Crossing Pipe Replacements
Completed 03/03/2026 Category: Roadway
Railroad and stormwater pipe enhancements across Peace River Shores BoulevardPirate Harbor Maintenance Dredge - Exterior
Last Updated: 03/03/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
South Gulf Cove Maintenance Dredge - Exterior
Last Updated: 03/03/2026 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for maintenance dredging of the South Gulf Cove Exterior Maintenance Dredge Project.
Waterway Hurricane Debris Removal-Grant Funded
Last Updated: 03/03/2026
Remove hurricane debris from approximately 37 miles of navigable waterways througout the county.Last Updated: 03/02/2026 Category: Sales Tax Funded Category: Sidewalks Current Phase: Planning and Project Approval
Design and construct a sidewalk on Airport Road. as part of the 2020 sales tax CIP
Atwater Street Sidewalk Project
Last Updated: 03/02/2026 Category: Sidewalks Category: Sales Tax Funded Current Phase: Design Development
The CCBOCC has requested a sidewalk be designed and constructed on Atwater St. as part of the 2020 Sales Tax Extension.Burnt Store Road East-West Connector
Last Updated: 03/02/2026 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.Last Updated: 03/02/2026 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.
Caring Way and Brinson Avenue Sidewalks
Last Updated: 03/02/2026 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue Sidewalks