Disaster Recovery Site - West Port Water Reclamation Facility
Last Updated: 04/08/2026 Category: Disaster Recovery Site
Hurricane Ian caused significant damage throughout the wastewater treatment plant.
Disaster Recovery Site - Zemel Road Landfill
Last Updated: 04/08/2026 Category: Disaster Recovery Site
Gillot Boulevard Landscape and Irrigation Project
Last Updated: 04/08/2026 Category: Landscape Current Phase: Planning and Project Approval
Beautification of Gillot Boulevard between Holton Terrace and Bluestone Street in the entrance median at the request of the MSBU Advisory board.Gulf Cove Interior Canal Design and Maintenance Dredge Project
Last Updated: 04/08/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for the maintenance dredging of parts of the Gulf Cove interior waterways to the 4' MLW maintenance depth.
Manchester Maintenance Dredge - Exterior and Interior
Last Updated: 04/08/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for spot dredging on both the exterior and certain interior channels.
Northwest Port Charlotte Maintenance Dredging - Exterior
Last Updated: 04/08/2026 Category: Coastal Current Phase: Planning and Project Approval
Design, permitting, and dredging of the exterior parts of the access channels, and the interior parts of the mouths of the Apollo, Venus and Cheshire channels for the Northwest Port Charlotte Waterway MSBU. The project may also include the Juno Waterway.
Pirate Harbor Maintenance Dredge - Exterior
Last Updated: 04/08/2026 Category: Coastal Current Phase: Design Development
Surveying, design, permitting, and construction oversight for maintenance dredging parts of the Pirate Harbor waterway system. This project is for approximately the landward half of the access channel and inland connector canals. The finger canals are not included in this project.
SR 776 - Murdock Circle to Myakka River Bridge Median Landscape Project
Last Updated: 04/08/2026 Category: Landscape Current Phase: Design Development
The county, with funding from FDOT, shall construct and maintain landscaping in the median of SR 776 between Murdock Circle and the Myakka River Bridge.Last Updated: 04/07/2026 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following Districts: Greater Port Charlotte, Lemon Bay, South Burnt Store.