Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 10/17/2024 Category: Drainage Current Phase: Design Development
Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.NWPC Interior Canal Maintenance Dredge
Last Updated: 09/20/2024 Category: Coastal Current Phase: Turnover and Closeout
Northwest Port Charlotte waterway maintenance dredge design project. Design, plan, and permit a limited dredge project for the MSBU.Cape Haze Wastewater Expansion
Last Updated: 09/10/2024 Category: Utilities Category: Utilities Current Phase: Complete
Ainger Creek Boat Ramp Replacement
Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.
Family Services Center - Phase 2
Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete
Design a new scalable fire station to replace the existing station.Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete
Design a new scalable fire station to replace the existing Fire Station 5. The new station will be located along Burnt Store Road.Burnt Store Road East-West Connector
Last Updated: 01/17/2024 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.SR 776 Wastewater Force Main Replacement
Last Updated: 12/15/2023 Category: Utilities Current Phase: Complete
This project involves upsizing the existing 6-inch sewer lines to 12-inch and 16-inch lines along SR 776 from Biscayne Drive to the Charlotte Sports Park.