Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Manasota Key Sidewalk, Lighting & Landscaping
Last Updated: 04/14/2025 Category: Sidewalks Category: Landscape Category: Other Current Phase: Design Development
Gulf Boulevard Sidewalk, Lighting & LandscapingLandfill Scale House (Zemel Road)
Last Updated: 03/26/2025 Category: County Facilities Current Phase: Complete
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Hillsborough Boulevard Water Main Project
Last Updated: 03/24/2025 Current Phase: Construction
This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Last Updated: 03/13/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkHarold Avenue Generator Mitigation Grant
Last Updated: 01/31/2025 Current Phase: Turnover and Closeout
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.
William R. Gaines Jr. Veterans Memorial Park
Last Updated: 01/03/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Complete
Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.Cape Haze Wastewater Expansion
Last Updated: 09/10/2024 Category: Utilities Category: Utilities Current Phase: Complete
Ainger Creek Boat Ramp Replacement
Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.
Family Services Center - Phase 2
Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.