South Gulf Cove Parallel Locks Project
Last Updated: 01/18/2023 Category: Coastal Current Phase: Design Development
Engineering design project of the South Gulf Cove Parallel Lock.Last Updated: 01/18/2023 Category: Coastal Current Phase: Design Development
Design, permit, and construct a maintenance dredge event within the Pirate Harbor waterway system. This project will include construction oversight with post dredge bathymetric surveys for project certification. This project is for approximately the landward half of the access channel inland connector canals. The finger canals are not included in this project.Last Updated: 01/18/2023 Category: Coastal Current Phase: Construction
Design and permitting of a maintenance dredge project in the Hayward waterway system.NWPC Interior Canal Maintenance Dredge
Last Updated: 01/18/2023 Category: Coastal Current Phase: Construction
Northwest Port Charlotte waterway maintenance dredge design project. Design, plan, and permit a limited dredge project for the MSBU.Harold Avenue Generator Mitigation Grant
Last Updated: 01/06/2023 Current Phase: Construction
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.