Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Hillsborough Boulevard Water Main Project
Last Updated: 03/24/2025 Current Phase: Construction
This project will install an 8-inch water main along Hillsborough Boulevard from Yorkshire St. to US 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Last Updated: 03/13/2025 Category: Sidewalks Current Phase: Construction
Dorchester Street SidewalkHarold Avenue Generator Mitigation Grant
Last Updated: 01/31/2025 Current Phase: Turnover and Closeout
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.Last Updated: 01/29/2025 Category: County Facilities Current Phase: Planning and Project Approval
The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.
William R. Gaines Jr. Veterans Memorial Park
Last Updated: 01/03/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Complete
Design and construction of upland and wetland trails throughout William R. Gaines Jr. Veterans Memorial park.NWPC Interior Canal Maintenance Dredge
Last Updated: 09/20/2024 Category: Coastal Current Phase: Turnover and Closeout
Northwest Port Charlotte waterway maintenance dredge design project. Design, plan, and permit a limited dredge project for the MSBU.Cape Haze Wastewater Expansion
Last Updated: 09/10/2024 Category: Utilities Category: Utilities Current Phase: Complete
Ainger Creek Boat Ramp Replacement
Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.