Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 09/01/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementWashington Loop Road over Shell Creek and Myrtle Slough Bridge Rehabilitations
Last Updated: 09/01/2026 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridges over Shell Creek and Myrtle SloughLast Updated: 08/31/2026 Category: Utilities Current Phase: Construction
Construction of a wastewater collection system to service approximately 1,300 properties with sewer service, new water service lines and a sewer vacuum station.Ainger Creek Boat Ramp Replacement
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Allapatchee Shores Park - Stormwater and Parking EnhancementsBallfield LED Lighting Conversion-Centennial Park Soccer Fields
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-CP Soccer FieldsBallfield LED Lighting Conversion-HARP Baseball Field #4
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Ballfield LED Lighting Conversion-HARP Baseball Field #4Bayshore Live Oak Park - West Fishing Pier
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Construction
Total replacement of the western fishing pier at Bayshore Live Oak Park.Bayshore Live Oak Park Seawall Replacement
Last Updated: 08/28/2026 Category: Parks And Recreation Current Phase: Design Development
Bayshore Live Oak Park Seawall Replacement