Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Babcock Ranch CCSO District 5 Office
Last Updated: 07/26/2024 Category: County Facilities Current Phase: Construction
A Master Developement Order agreement between Charlotte County and the developer has been made to build a new Law Enforcement Office located in southern Charlotte County as part of the Master Babcock Ranch Concept Plan.Last Updated: 07/26/2024 Category: County Facilities Current Phase: Construction
This 12,000 square foot three-bay facility will be a state-of-the art with hurricane impact rated bi-fold doors for additional protection. The interior build-out process has started with HVAC duct work and electrical conduit installation.Ainger Creek Boat Ramp Replacement
Last Updated: 05/03/2024 Category: Parks And Recreation Current Phase: Design Development
This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent restroom facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.Family Services Center - Phase 2
Last Updated: 05/03/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Turnover and Closeout
Completed the Human Services integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the Human Services' staff offices were constructed along with critical shared support facilities, maker space, and expanded services.Bridgeless Barrier Islands Accessibility Study
Last Updated: 04/12/2024 Category: Other Current Phase: Planning and Project Approval
This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, goods, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, Don Pedro Island, and Knight Island/Thornton Key.Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete
Design a new scalable fire station to replace the existing station.Last Updated: 01/29/2024 Category: County Facilities Current Phase: Complete
Design a new scalable fire station to replace the existing Fire Station 5. The new station will be located along Burnt Store Road.Burnt Store Road East-West Connector
Last Updated: 01/17/2024 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.Cochran Boulevard Reclaim Extension
Last Updated: 12/21/2023 Category: Utilities Current Phase: Complete
Construction of reclaimed water mains along the right-of-way of Cochran Boulevard from Quesada Avenue to Peachland Boulevard. Also, work will occur along Peachland Boulevard to Forrest Nelson Boulevard.