Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 10/15/2025 Current Phase: Planning and Project Approval
North County Public Works Yard
Last Updated: 10/15/2025 Category: County Facilities Current Phase: Complete
A Public Works presence in North & Mid-County is critical for their operation. The old JB Yard on Kenilworth Blvd has been demoed for the new Charlotte Transit Facility. The County has purchased new property located at 18181 Sinatra Ave in Port Charlotte for the Public Works Yard.
Disaster Recovery Site - Beach Erosion
Last Updated: 10/13/2025 Category: Disaster Recovery Site
Hurricane Ian caused severe shoreline erosion at Manasota Key, Don Pedro, and Stump Pass, displacing hundreds of thousands of cubic yards of sand. The dune system and seawalls were heavily damaged, exposing properties to storm risks. Additional damage affected beach fill, mangrove roots, riprap, pavilions, sidewalks, boat ramps, and docks, many of which need repair or replacement.
Disaster Recovery Site - South Gulf Cove Access Channel
Last Updated: 10/13/2025 Category: Disaster Recovery Site
Hurricane Ian caused land-based washouts and runoff into MSBU-maintained navigable waterways.Allapatchee Shores Park - Stormwater and Parking Enhancements
Last Updated: 10/03/2025 Current Phase: Planning and Project Approval
Allapatchee Shores Park - Stormwater and Parking EnhancementsLakeview/Midway Wastewater Expansion
Last Updated: 09/17/2025 Category: Utilities Current Phase: Design Development
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Last Updated: 09/03/2025 Category: County Facilities Current Phase: Planning and Project Approval
The Cultural Center Replacement project was approved to move forward with masterplanning and programming by the Board of County Commissioners on March 12th 2024 following a series of public input activities and final presentation. The board granted $750,000 to proceed with advertising for a consultant. Additionally the direction was given to move forward with demolition of the existing facility scheduled for FY26. The full design and permitting phase is scheduled for funding in FY27 with construction funding in FY28.Last Updated: 08/28/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development
Construction of a new 4 stall apparatus bay Fire Station on the NW corner of Tamiami Trail & Green Gulf Blvd at the Tuckers Grade intersection in Punta Gorda.