Disaster Recovery Site - Roads and Bridges - FHWA
Last Updated: 02/03/2026 Category: Disaster Recovery Site
Hurricane impacts caused widespread damage to roadways, bridges, and drainage systems across multiple sites.
Disaster Recovery Site - Roads and Bridges - Non-FHWA
Last Updated: 02/03/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Tom Adams Bridge
Last Updated: 02/03/2026 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 02/03/2026 Current Phase: Planning and Project Approval
Kings Hwy Harborview Rd Intersection Improvements
Last Updated: 02/03/2026 Category: Roadway Current Phase: Construction
Kings Hwy Harborview Rd Intersection Improvements. Traffic signal hardening.
Tom Adams Bridge Emergency Repair - Hurricane Milton
Last Updated: 02/03/2026
The Tom Adams Bridge sustained damage from Hurricane Milton, necessitating emergency repairs.
Last Updated: 01/28/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.Last Updated: 01/28/2026 Category: County Facilities Category: Sales Tax Funded Current Phase: Design Development
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.
Placida West Boat Ramp Expansion
Last Updated: 01/28/2026 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.