South County Regional Park Improvements-Final Phase
Last Updated: 12/05/2025 Category: Parks And Recreation Current Phase: Design Development
Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
Last Updated: 12/04/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge
See attached location map and bridge pictures.
Burnt Store Road East-West Connector
Last Updated: 12/02/2025 Category: Roadway Current Phase: Planning and Project Approval
Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)
Last Updated: 12/02/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval
Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)Gasparilla Road/Pioneer Trail Sidewalk Extension
Last Updated: 12/02/2025 Current Phase: Planning and Project Approval
Harbor Boulevard Intersection Improvements
Last Updated: 12/02/2025 Category: Roadway Current Phase: Planning and Project Approval
This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.South Gulf Cove Parallel Locks Project
Last Updated: 12/02/2025 Category: Coastal Current Phase: Planning and Project Approval
Engineering design project of the South Gulf Cove Parallel Lock.Completed 12/02/2025 Category: Coastal
The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.Sunshine Lake/Sunrise Waterway Monitoring Program
Last Updated: 12/02/2025 Category: Other Current Phase: Construction
This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway.






