Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

South County Regional Park Improvements-Final Phase

South County Regional Park Improvements-Final Phase Sales Tax Project

Last Updated: 12/05/2025 Category: Parks And Recreation Current Phase: Design Development

Read More

Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge News Image

Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge

Last Updated: 12/04/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval

Rotonda  Bridge #014113 - Hurricane Ian Damaged Bridge

See attached location map and bridge pictures.

Read More

Burnt Store Road East-West Connector News Image

Burnt Store Road East-West Connector

Last Updated: 12/02/2025 Category: Roadway Current Phase: Planning and Project Approval

Charlotte County has undertaken this study in response to the future growth along the Burnt Store Road Corridor.

Read More

Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)

Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)

Last Updated: 12/02/2025 Category: Disaster Recovery Site Current Phase: Planning and Project Approval

Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)

Read More

Gasparilla Road/Pioneer Trail Sidewalk Extension News Image

Gasparilla Road/Pioneer Trail Sidewalk Extension

Last Updated: 12/02/2025 Current Phase: Planning and Project Approval

Read More

Harbor Boulevard Intersection Improvements News Image

Harbor Boulevard Intersection Improvements

Last Updated: 12/02/2025 Category: Roadway Current Phase: Planning and Project Approval

This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.

Read More

South Gulf Cove Parallel Locks Project News Image

South Gulf Cove Parallel Locks Project

Last Updated: 12/02/2025 Category: Coastal Current Phase: Planning and Project Approval

Engineering design project of the South Gulf Cove Parallel Lock.

Read More

Stump Pass Maintenance Dredge

Stump Pass Maintenance Dredge

Completed 12/02/2025 Category: Coastal

The primary purpose for the Project is to provide erosion control and shoreline stabilization measures including maintenance dredging and beach disposal for approximately 5,000 feet of eroding gulf and inlet shorelines utilizing Navigation Channel sediments.

Read More

Sunshine Lake/Sunrise Waterway Monitoring Program

Sunshine Lake/Sunrise Waterway Monitoring Program

Last Updated: 12/02/2025 Category: Other Current Phase: Construction

This project is for water quality monitoring of Sunshine Lake / Sunrise Waterway. 

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us