Hillsborough Boulevard Water Main Project
Last Updated: 04/16/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
Ainger Creek Boat Ramp Replacement
Last Updated: 04/14/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Mid County Transfer Station Wall
Last Updated: 03/31/2026 Category: County Facilities Current Phase: Design Development
Supervisor of Elections Warehouse
Completed Category: County Facilities Category: Sales Tax Funded
Provide new 20,000 sq ft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sq ft for emergency managemet and facilities.
East Port Water Reclamation Facility Expansion
Last Updated: 02/23/2026 Category: Utilities Current Phase: Construction
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Last Updated: 02/05/2026 Category: Utilities Current Phase: Planning and Project Approval
The Utilities Department is building its first ever water tower.
Disaster Recovery Site - Burnt Store Water Treatment Plant
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
Hurricane Ian damaged many mechanical components and fencing to the Burnt Store Water Treatment Plant.
Disaster Recovery Site - Gulf Cove Water Booster Station
Last Updated: 01/12/2026 Category: Disaster Recovery Site Category: Utilities
Hurricane Milton damaged the building's roof.