South Gulf Cove FY24 Bridge Rehabilitations
Last Updated: 11/14/2025 Category: Bridges Current Phase: Design Development
South Gulf Cove FY24 Bridge Rehabilitations - Bridges #014065, #014070, #014072Washington Loop over Prairie Creek Bridge Replacement
Last Updated: 11/14/2025 Category: Bridges Current Phase: Design Development
Washington Loop Road Bridge over Prairie Creek - Bridge ReplacementLast Updated: 11/13/2025 Category: Roadway Current Phase: Complete
The purpose of this project is to resurface Charlotte County roadways in the following districts: Greater Port Charlotte, Pirate Harbor, Woodland Estates, Road and Bridge.2025 Annual Road and Bridge/MSBU Paving Program
Last Updated: 11/13/2025 Category: Roadway Current Phase: Construction
The purpose of this project is to maintain the roadway system of Charlotte County in the following District: Road and Bridge, Englewood East, and Placida MSBU's.Manchester Maintenance Dredge - Exterior and Interior
Last Updated: 11/13/2025 Category: Coastal Current Phase: Planning and Project Approval
Surveying, design, permitting, and construction oversight for spot dredging on both the exterior and certain interior channels.
Weir Inspection and Repair Design
Last Updated: 11/13/2025 Category: Drainage Current Phase: Design Development
The ELK 3.45, FOR 5.11 and a weir on the Pellam Waterway were found to be damaged. The cause of the damage is not known. An engineering firm has been retained to assess these three water control stuctures to determine the extent of the deficincies and then to prepare a cost effective plan that will successfully restore the structures so that they operate as designed.Last Updated: 11/12/2025 Category: Parks And Recreation Current Phase: Planning and Project Approval
The Bayshore Grass Parking area was severely damaged by Hurricane Milton. A new assessment is required to confirm that the previous design will still meet current project needs. Submittals have been received, and an engineer of record has been confirmed. Contract negotiations are in progress, and once final designs are approved, the County will advertise the project for construction bids to begin reestablishing and hardening the parking area.Last Updated: 11/12/2025 Current Phase: Design Development
The continued growth of Charlotte County requires an enhanced disaster response through a whole community approach and collaborative problem solving to ensure timely protective actions, a more educated, informed and prepared population and resilient infrastructure.
Last Updated: 11/12/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction will include two (2) playgrounds including shade structures, one ages 2-5 and one ages 6-12, one large pavilion and two small pavilions, one tennis court, four pickleball courts, one basketball court, two sand volleyball court, fitness hub with shade structure, multi-purpose field area and exercise trail.








