Disaster Recovery Site - Lift Stations
Last Updated: 06/01/2026 Category: Disaster Recovery Site Category: Utilities
Charlotte County experienced extensive damage to fencing, antenna systems and site infrastructure.Mid-County Library Hurricane Repairs
Completed Category: County Facilities
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.
Disaster Recovery Site - CCSO District 1
Last Updated: 05/26/2026 Category: Disaster Recovery Site
The building suffered storm damage to about 100 feet of roof, along with damage to fascia, soffit, interior ceilings, walls, floors, doors, trim, furniture, equipment, and contents, with further assessment pending.
Disaster Recovery Site - Charlotte County Jail
Last Updated: 05/26/2026 Category: Disaster Recovery Site
The facility suffered extensive storm damage to fences, roofs, HVAC and mechanical systems, electrical and security systems, and critical equipment like generators and water components, necessitating major repairs and replacements.
Disaster Recovery Site - Charlotte Sports Park
Last Updated: 05/26/2026 Category: Disaster Recovery Site
Storm damage affected fencing, gates, shade structures, batting cages, pavilions, boardwalks, lighting, signage, and playgrounds. Several buildings sustained roof and water damage, while trees, antennas, electrical components, and sports equipment were also damaged or lost.
Disaster Recovery Site - Cultural Center
Last Updated: 05/26/2026 Category: Disaster Recovery Site
Several buildings suffered interior water damage from roof leaks, affecting ceilings, insulation, drywall, flooring, and lighting. Parking and pole lights are leaning, the fire alarm needed resetting, and minor exterior damage occurred to gutters, flashing, and electrical systems. Facility will be demolished and master plan developed for its potential replacement.
Disaster Recovery Site - East Port Environmental Campus
Last Updated: 05/26/2026 Category: Disaster Recovery Site Category: Utilities
Storm damage affected multiple facilities and caused major equipment failures.
Disaster Recovery Site - Fire Station 1
Last Updated: 05/26/2026 Category: Disaster Recovery Site
Storm-related damage includes exterior impacts to the building near the entrance and damage to a 30-foot aluminum flagpole.
Disaster Recovery Site - Fire Station 12
Last Updated: 05/26/2026 Category: Disaster Recovery Site
The roof, signage, and rear middle garage door sustained hurricane damage.