Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Disaster Recovery Site - Gulf Cove Water Booster Station News Image

Disaster Recovery Site - Gulf Cove Water Booster Station Disaster Recovery Project Site

Last Updated: 12/08/2025 Category: Disaster Recovery Site Category: Utilities

Hurricane Milton damaged the building's roof.

Read More

Disaster Recovery Site - Lift Stations News Image

Disaster Recovery Site - Lift Stations Disaster Recovery Project Site

Last Updated: 12/08/2025 Category: Disaster Recovery Site Category: Utilities

Charlotte County experienced extensive damage to fencing, antenna systems and site infrastructure.

Read More

Disaster Recovery Site - Rotonda Water Reclamation  Plant News Image

Disaster Recovery Site - Rotonda Water Reclamation Plant Disaster Recovery Project Site

Last Updated: 12/08/2025 Category: Disaster Recovery Site Category: Utilities

The warehouse and storage buildings sustained catastrophic damage. One storage building was completely destroyed, with all four walls gone and water actively flowing through the former footprint.

Read More

Disaster Recovery Site - West Port Water Facility News Image

Disaster Recovery Site - West Port Water Facility Disaster Recovery Project Site

Last Updated: 12/08/2025 Category: Disaster Recovery Site

Hurricane Ian caused significant damage throughout the wastewater treatment plant.

Read More

East Port Water Reclamation Facility Expansion News Image

East Port Water Reclamation Facility Expansion

Last Updated: 12/08/2025 Category: Utilities Current Phase: Construction

This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.

Read More

Hillsborough Boulevard Water Main Project News Image

Hillsborough Boulevard Water Main Project

Last Updated: 12/08/2025 Category: Utilities Current Phase: Construction

This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.

Read More

Lakeview/Midway Wastewater Expansion News Image

Lakeview/Midway Wastewater Expansion

Last Updated: 12/08/2025 Category: Utilities Current Phase: Design Development

This project proposes construction of a wastewater collection system to service properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system. 

Read More

Bissett Park

Bissett Park

Completed 12/05/2025 Category: Parks And Recreation

Creation of park master plan and phase 1 development

The concept planis broken into two phases and Phase 1 includes the addition of a 9 hole disc golf course, a toddler/sensory playground to compliment the existing playground, exercie equipment, multi-use sport fields, a natural walking trail, modular skate park and sport courts. Phase 2 includes a recreation center, fishing pier, picnic shelters, a restroom and playground expansion. The recreation center will double as a storm shelter during hurricane season. 

Read More

Myakka Park News Image

Myakka Park

Last Updated: 12/05/2025 Category: Parks And Recreation Current Phase: Construction

Creation of a master plan through the park design process and phase 1 development.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us